FL SR 823 RED ROAD PHASE II (W. 23RD ST TO W.46TH ST)
FL SR 823 RED ROAD PHASE II (W.23RD ST TO W 46TH ST)
This roadway construction project includes reconstruction and widening of SR 823 (NW 57th Ave) from West 23rd St. to West 46th St. into the Red Road Canal; implementing multiple traffic switches for construction phasing; constructing a new bulkhead composed of concrete sheet panels and piles along the west side of NW 57th Avenue; installing twin 84 culverts at multiple locations along the west side of NW 57th Avenue, installing temporary critical steel sheet pile to support/protect existing 54 water main, sidewalks along the east side of NW 57th Avenue. Installing curb and gutter on the east side of NW 57th Avenue; Removing trees that conflict with the installation of new drainage structures throughout the project; Installing multiple new traffic signals at street intersections; the installation of drainage and utilities; driving more than 800 concrete precast piles and panels; Installing new landscape; installing new project lighting; installing multiple concrete drill shafts; milling; resurfacing.
OWNER
FDOT
DESIGN TEAM
Jacobs Engineering Group