BRIDGES
BRIDGES OF THE ISLES OF LAS OLAS
BRIDGES OF THE ISLES OF LAS OLAS
This project replaced five existing bridges in the City of Fort Lauderdale. These bridges, which were constructed between 1946 and 1959, were evaluated and found to be structurally deficient requiring complete replacement. All five bridges were fixed, low-level bridges. The four Nurmi Isle bridges have now (2) 10’ lanes and 6’ sidewalks and the Sunrise Key bridge have now (2) 11’ lanes (minimum) and 7’ sidewalks. Each bridge replacement was accomplished in two construction phases.
OWNER
Florida Department of Transportation - District 4 - Broward Operations
DESIGN TEAM
Gannett Fleming
LOCATION
E. Las Olas Blvd and Sunrise Key Blvd., Ft. Lauderdale, FL