Road - SR 934 Hialeah Expressway

  • SR 934 Hialeah Expressway
  • SR 934 Hialeah Expressway
MORE MEDIA:
  • SR 934 Hialeah Expressway
  • SR 934 Hialeah Expressway
Owner: 
FDOT
Design team: 
Beiswenger, Hoch & Assoc. Inc.
Delivery method: 
Design-Bid-Build

Widening and reconstruction of SR 934 consisting of the following: Addition of 1 lane each way, widening the road from four to six lanes. Project scope included widening of bridges over the FEC Railroad at NW 69th Ave and W. 5th Way; construction of new bridge at the crossing of SR 934 over Okeechobee Road/ Miami River Canal/ NW South River Drive; upgrade of drainage, lighting, signals and construction of noise wall near residential areas.