An award winning Metrorail Station at the end of the Transit way Extension just west of Palmetto Expwy, the 22nd station in the Metrorail system.
Construction of the first extension of the Metrorail system in 14 years.
Project scope called for construction of a Grade Separated Overpass in place of the existing intersection of Golden Gate Parkway and Airport-Pullin
Reconstruction of LeJeune Road, between NW 36th Street and Okeechobee Road.
The project consisted of the construction of three new bridges over the I-75 Canal, the widening and renovation of the existing Golden Gate Parkway
Widening and reconstruction of SR 934 consisting of the following: Addition of 1 lane each way, widening the road from four to six lanes.
As part of the Love Field Modernization Program (LFMP), this phased project involves the replacement and reconstruction of the existing aircraft ap
This project consisted of the improvements of roadway reconstruction of NW 21st Street from East of NW 42nd Avenue to NW 37th Avenue. Scope includ
This project is located in Southern Palm Beach County adjacent to the Loxahatchee National Wildlife Refuge and consists of modifications to approxi
This Design-Build project included the construction of a double-span Sun Pass Gantry with Equipment Building, to the south of the existing Sunrise
Joint Venture Partner: FCC Construction, Inc.
This Project consists of the widening, milling, and resurfacing of the eastbound lanes along State Road 836/Dolphin Expressway from 1500 feet west
This roadway construction project includes reconstruction and widening of SR 823 (NW 57th Ave) from West 23rd St. to West 46th St.
This roadway construction project includes: Reconstruction and widening of the SR 823 (NW 57th Avenue) from West 46th Street to West 54th Street, a
The Runway 13L/31R Safety Area Enhancement Project is located at Dallas Love Field Airport and is funded through the City of Dallas and the FAA. T