The project consisted of the construction of 4-lane, 1.2 mile interch
Diagnostic analysis, design, and rehabilitation of all structural and
This project replaced five existing bridges in the
This project consits of widening mainline HEFT between SW 72nd Street
This roadway construction project consisted of the following: reconstruction and widening of the SR 823 (NW 57th Ave) from West 54th St.
Widening the two (2) lane rural undivided highway to a six (6) lane d
Widening the six (6) lane freeway to a eight (8) lane freeway from Sp
The purpose of Lakeside Ranch STA is to treat water in order to reduce phosphorus loading to Lake Okeechobee and the Everglades.
This two phase roadway modification and improvement project calls for the reconstruction of West Bound FM 544 from Dozier Road to Josey Lane in pha
Project consists of grading, drainage, paving and structures on an 8.84 mile stretch of highway on the PGBT. Specific scope elements include; 55,0
The project is built in two major phases and various stages.
Construction of approx 7.25 miles of new levee. Clearing and Grubbing of 1,340 Acres of existing vegetation.
The proposed improvements on this project focus on the Lehman Center Test Track/Lehman Yard Rehabilitation Expansion, Phase 1.
Widening and reconstruction of existing on and off ramps from the Florida Turnpike to PGA Boulevard, additions to the existing toll both including
The GTI Central Collections Plaza consists of a new centralized parking collections plaza, 17,000 SF administration building, several acres of site
Widening and reconstruction of the SR 836 Expressway approximately 1.1 miles in length, from 1900 feet east of NW 107th Ave to 2500 west of 87th Av
The proposed improvements on this project include the conversion of the southern HEFT to an All Electronic (AET) collection system.
A fast-track Design-Build project where we provided construction management and design services for the construction of two 40-feet platforms with