Owner: 
FDOT
Design team: 
C.H. Perez & Associates Consulting Engineering
Delivery method: 
Bid Build

This roadway construction project includes: Reconstruction and widening of the SR 823 (NW 57th Avenue) from West 46th Street to West 54th Street, approximately half a mile; implementing multiple traffic switches for construction phasing; constructing a bulkhead concrete pile and panel on the west side of NW 57th Avenue; installing twin 74; culverts along the west side of NW 57th avenue, sidewalks along the east side of NW 57th Avenue; installing curb and gutter on the east side of NW 57th Avenue; widening the Little River Bridge which included replacement of post tensioning bars on existing slabs; removing trees that conflict with the installation of new drainage structures throughout the project; installing multiple new traffic signals at street intersections; construction of the entire W, 49th Street intersection with W. 4th Ave in 5 days (1 day ahead of schedule) the installation of drainage and utilities; installing a new subaqueous 54; water main under both Little River Canal and Red Road Canal; driving over 250 concrete precast piles; installing new; landscape; installing new roadway lighting; installing multiple concrete drill shafts; milling; resurfacing.